Year: 2010
Roll: Trail Design and Construction Managment
Project info: Trail Source was onsite to design and manage the crews that built 25 miles of single track in an old iron mine which is currently a IMBA Bronze Level ride center.
Year: 2010
Roll: Trail Design and Construction Managment
Project info: Trail Source was onsite to design and manage the crews that built 25 miles of single track in an old iron mine which is currently a IMBA Bronze Level ride center.